Medical Projects

2021-04-28 08.04.11
2021-04-28 08.04.11

2021-04-07 14.07.56
2021-04-07 14.07.56

2020-08-11 13.17.34
2020-08-11 13.17.34

2021-04-28 08.04.11
2021-04-28 08.04.11

1/9
Imaging Center Temecula

Scope of Work includes demolition, tenant improvement for a 1,400 SF MRI equipment plus equipment room, changing room, technicians’ room, CT Scan Room, Drywall, lead shielding, cabinets, flooring and painting.

Temecula, California 2021

Imaging Center Anaheim

Full planning, design, construction drawings, city plan check and building permits, demolition, tenant improvement for a 1,600 SF MRI equipment plus equipment room, changing room, technicians’ room, electrical upgrade through City of Anaheim Public Utilities, cabinets, flooring and painting.

Anaheim, California 2019

2019-07-23 11.43.20
2019-07-23 11.43.20

2019-07-23 11.42.58
2019-07-23 11.42.58

2018-08-23 10.27.37-1
2018-08-23 10.27.37-1

2019-07-23 11.43.20
2019-07-23 11.43.20

1/6
2019-008
2019-008

2019-007
2019-007

2018-001
2018-001

2019-008
2019-008

1/8
Downey Medical Building

Full planning, design, construction drawings, city plan check and building permits, demolition, grading, full construction for a 4,000 SF single story medical building inside the redevelopment zone of the City of Downey.

Downey, California 2018-2019

Saddleback Derma TI

Full tenant improvement for a 7,000 SF dermatology clinic and a dental clinic on a second floor based on plans prepared by an Irvine based architectural firm using high end finishes.  Scope of work included demolition, framing, plumbing, HVAC, electrical, drywall, doors, suspended ceiling, hard lid ceiling, fancy lighting, engraved LED lighting, cabinets, painting and flooring.

Lake Forest, California 2018

2018-10-11 06.43.12
2018-10-11 06.43.12

2018-10-11 06.40.45
2018-10-11 06.40.45

2018-04-11 11.38.40
2018-04-11 11.38.40

2018-10-11 06.43.12
2018-10-11 06.43.12

1/14

1/12
Back Bay Imaging Center

Design-Build full imaging center clinic housing MRI, CT-Scan, X-Ray, and C-Arm equipment. Tenant Improvement included design, city permits, upgrade power via Edison, electrical, HVAC, plumbing, walls, shielding, ceilings, doors, cabinets, flooring, and paint

Newport Beach, CA (2017)

Imaging Center Long Beach

Full planning, design, construction drawings, city plan check and building permits, demolition, tenant improvement for a 1,400 SF MRI equipment plus equipment room, changing room, technicians’ room, cabinets, flooring and painting.

Long Beach, California 2016

2016-05-11 08.49.06
2016-05-11 08.49.06

2016-05-11 08.50.47
2016-05-11 08.50.47

2016-05-31 12.05.25
2016-05-31 12.05.25

2016-05-11 08.49.06
2016-05-11 08.49.06

1/5

1/10
Atlantis Eyecare

Design-Build Full Eyecare Clinic including Ophthalmologist and Retina clinics. Tenant Improvement included design, city permits, doors, windows and full utilities.

Torrance, CA (2015)

SoCal Imaging Center

Remodel Imaging Center. Replace flooring, redo electrical works meeting imaging equipment specs. Open wall to facilitate entry of CT-Scan, X-Ray MRI equipment and installation. Supply and install lead and copper coated doors, HVAC, painting and suspended ceiling.

Mission Viejo, CA (2015)

1/8
2014-04-24 13.07.47
2014-04-24 13.07.47

2014-04-24 13.08.50
2014-04-24 13.08.50

20140228_161152
20140228_161152

2014-04-24 13.07.47
2014-04-24 13.07.47

1/8
Internist Clinic TI

Full design, construction drawings, city plan check and building permits, demolition, full tenant improvement for a 1,800 SF single internist clinic including, flooring, cabinets, electrical, plumbing, ceilings and painting.

Mission Viejo, California 2014

Lukac Eye Physician and Surgeon

Design-Build Ophthalmologist Clinic inside A-1 Medical Building.  Tenant Improvement included design, city permits, medical cabinets and full utilities, data ports among others

Laguna Hills, CA (2012)

1/6

1/5
Pacific Pro PT

Design-Build Physical Therapy Clinic inside A-1 Medical Building.  Tenant Improvement included design, city permits, medical cabinets and full utilities, sports equipment  among others

Laguna Hills, CA (2012)

Dentistry for your Smile

Design-Build Dental Clinic inside A-1 Medical Building.  Tenant Improvement included design, city permits, medical cabinets, under-slab plumbing and compressed air to all dental chairs

Mission Viejo, CA (2012)

1/7
DSC06755
DSC06755

DSC06766
DSC06766

DSC06771
DSC06771

DSC06755
DSC06755

1/5
Odyssey Integrative Medicine Clinic TI

Project Management, planning and space design for a 2,400 SF upscale medical clinic in Irvine on the second floor.  Construction drawings, city plan check and building permits, demolition, tenant improvement, plumbing, framing, electrical, HVAC, fire sprinkler, suspended ceiling, paint and flooring.

Irvine, California 2011

Canyon Orthodontist

Project management for a fully functional orthodontist clinic including design, City approval, Construction, Finishes and handover. Total scqure footage 2,000.

Rancho Santa Magarita, CA (2004)

1/3