Commercial Projects

Hilton San Gabriel
Project Management for 6-story Hotel/Retail development on 4.0-acre with 2-story underground parking. Coordinate with Owner, Architect, Consultants and Agencies.
San Gabriel, CA (2004)
Sunny Plaza
Project Management for a two-story retail and office development with full underground parking. Structure is steel framing and wood framing. Total built up area 45,000 SqFt
San Gabriel, CA (2000)
State Farm
Design-Build State Farm Offices. Tenant Improvement included design, city permits, doors, windows and full utilities
Rancho Santa Margarita, CA (2014)
City of Knowledge
Converting 33,000 SF bowling alley Center into a church and private school, K1 to 9 grades. Design, city process, engineering, construction and full building rehabilitation
Pomona, CA (1997)
Pose
Tenant improvement at Main Place Mall for photo studio and photo lab. Marble, glass, laminate, foam-plaster columns and powder-coated steel finishes
Santa Ana, CA (1998)
San Bernardino, CA (1998)
L'Uomo
Tenant improvement for clothes store inside mall including gypsum roman columns, marble cladding, glass and laminate finishes
Downey, CA (1996)
AB Plastics
Design, engineering, county process and construction for 3,000 SF office building and commercial grade handicapped restrooms inside industrial plant. Finishes include solid cherry doors, solatube, custom designed ceilings and wallpaper
Gardena, CA (1997)